News
Home / News

NEWS AND EVENTS

  • According to the news released by the National Bidding Network and the Chinese Government Procurement Network, Oulun (Dalian) Shipbuilding Co., Ltd. won the bid for the Liaoning Maritime Safety Administration and the Guangdong Maritime High Performance Patrol Boat Project.

    2019.07.09

    Read More
  • China's first domestic aircraft carrier began to hoist and replace the FRP life raft on the port side on June 21, indicating that its service period is approaching and will be unveiled in a new installation.

    2019.06.24

    Read More
  • Water weight bags,also called water filled weight bags,load test water bags,it is designed to provide proof load testing service for the lifting equipment and structures.

    2019.06.13

    Read More
  • Inspection and Test for Water-spray System: 1) With the boat in an upright position and in the light condition, run the engine at the rated revolution, then run the water-spray pump, the sprayed water film should cover the whole surface of the boat, and the pipe of water-spray system should have no leakage; 2) Successively trim the boat 5 degrees by the head and 5 degrees by the stern, and heel it 5 degrees to port and 5 degrees to starboard, the sprayed water film should cover the whole surface of the boat.

    2019.05.27

    Read More
  • Release Mechanism Test: 1) Check the equipped quality of release mechanism: hook,connection,soft axle and pipe; 2) Load the lifeboat so that the total mass equals 1.1 times the mass of the lifeboat, all its equipment and the number of persons (load with xx kg), suspend boat form hooks just clear of the water surface, then release the hook device, the fore and aft hook should be released simultaneously, and the boat or the release mechanism should have no binding or damage; 3) The boat should do above mentioned test again with 10 degrees trim (fore and aft); 4) The fore and aft hook should be released simultaneously when boat fully waterborne in the light condition and in a 10% overload condition.

    2019.05.24

    Read More
  • On 26th & 27th of March 2019,Zhenjiang MATCHAU marine made the marine fire fighting system service training for Saudi customer,the training is held on schedule and we authorize the training technicians for services of our marine fire fighting systems & fire extinguisher after the training finished.

    2019.04.01

    Read More
  • Total 16 pages  Go to Page
  • Go
Home
Add:  No.221,Shuangzi Bd. A,Science Park,Dingmao,Zhenjiang,212009,P.R.China    E-mail: sales@matchaumarine.com
Tel: +86-511-88882551 / 15312365297
Copyright  2018 Zhenjiang Matchau Marine Equipment Co.,Ltd. All rights reserved.  Sitemap